Coverage
17.66 - 20.45 sq.mt/ltr/coat when applied on smooth and non-absorbent
surface.
Thinning
add 1 lit of water to 1.5kg of distemper
Drying time
surface dry: 30 minutes
Flash point
na
Recoating
after 4 - 6 hrs. (@27°± 2°c & rh 60 ± 5%)
Stability of thinned paint
use within 24 hrs
Gloss levels / sheen levels
matt