DOV® Coat Crystallization type waterproofing system.
A distinctive chemical formulation that penetrates concrete pores and forms
insoluble crystals blocking off water entry. The active chemicals continue to
crystallize whenever they come into contact with moisture making this system of
waterproofing unique. Suited for waterproofing of concrete basements, sumps,
swimming pools, water retaining structures, toilet slabs and roof slabs. The
surface to be treated should be saturated with water before application.
Is a Cementitious, brush applied, waterproofing treatment for concrete. When
it is mixed with water & applied to concrete, it penetrates into the
concrete mass protecting against the passage of water.
DOV® Coat Crystallization crystalline react
chemically to form billions of needles like crystals which blocks the pores,
voids & micro cracks in concrete. Pre saturation & subsequent re-
wetting of the surface will cause deeper diffusion of the organic chemicals
& formation of crystals at greater depth. It may take from seven days to
one month to reach its maximum waterproofing capability, depending on the
thickness of concrete. Environmental factors such as ambient temperature,
density of concrete, moisture present & weather conditions all can effect
the timing of sealing process. Under dry conditions, Dovcrystallisation
crystalline lies dormant. However it becomes reactive whenever it is re-exposed
to moisture. Dovcrystalline contains active waterproofing chemicals which react
with moisture and unhydrated cement in the concrete, creating insoluble
crystalline complexes which seal the capillaries and minor shrinkage cracks.
They penetrate even against strong hydrostatic pressure, becoming an integral
part of the concrete. The waterproofing chemicals remain active for the life of
the structure, permanently sealing it from water penetration.
Area Of Application
Water retaining Structures
|
Water Excluding Structures
|
Water tanks, towers
|
Basements
|
Reservoirs
|
Tunnels
|
Swimming pool
|
Inspection Pits
|
Water treatment works
|
Foundations
|
Dams
|
Lift shafts
|
Concrete Pipes
|
Construction Joints
|
Canals
|
Sea defence walls
|
Harbours
|
Retaining walls
Bridge Decks
Jetties
|
Features & Benefits
- Stops
water movement through concrete
- Protects
reinforcing steel against corrosion
- Waterproofs
minor cracking & seals shrinkage cracks up to 0.4 mm width.
- Its
waterproofing capability increases with time. i.e. It remains permanently
active.
- Does not
get affected by surface wear or abrasion
- Can be
applied to positive or negative side of concrete
- Non toxic,
thus good for use in drinking water containments
- Treated
concrete withstands hydrostatic pressure upto 150 mtr head.
- Easy in
application, only mix water at site.
- Protects
concrete against contaminated water & corrosion.
- Applicable
on moist substrates.
- It allows
concrete to breathe, but is not a vapour barrier
- Waterproofs
by deep crystallisation, where slabs or concrete rafts / PCC are to be
landscaped.
Method of Application
Surface Preparation to old
and existing substrates
- Remove
dirt, laitance, loose particles, paints, etc., by means of mechanical
grinding, sandblasting, and pressure water cleaning, or suitable
mechanical means.
- Remove all
protrusions, chisel out honeycombed / damaged areas, repair the cracks and
work back to sound concrete.
- It is
extremely important to ensure that the surface should be sound and
thoroughly surface prepared, and vacuum cleaned to a finish of a sand
paper, to allow Dovcrystalline to penetrate effectively. This can be
achieved by mechanical surface scarification, shot blasting, etc.
- Stop
active water leakages using Dov pluge Instant Leak Plug, for severe
infiltration.
- Thoroughly
rinse the surface with water several times to reach a “saturated surface
dry” (SSD) condition, where the surface should be damp, without any
standing water.
Curing
For External/Exposed Surface
·
- Completed
application should be moist cured for a minimum of 2-3 days &
protected from rain & light traffic for 12 hour. Start curing as soon
as Dovcrystalline has hardened sufficiently so that it may not be damaged
by a fine water spray. Heavy traffic should be avoided until the surface
has hardened atleast for 5 days.
- Finishes
containing Portland cement may be applied over Dovcrystalline after 3
hours, but other finishes & paints should not be applied before 28
days along with concrete.
- Back
filling can be carried out after 36 hours of application of
Dovcrystalline. Backfill material shall be moist & not contain rocks
or large aggregates
For Water Retaining Structures
- Water
tanks, etc., can be carefully filled with water after 3 to 7 days. Do not
fill large tanks faster than 6.5 feet per hour ( 2 m / 24 hrs )
- After
complete curing of Dovcrystalline, potable water tanks should be
thoroughly rinsed with potable water prior to being placed in service.
Mixing of Dovcrystalline
- Mix
Dovcrystalline powder to water in ratio 5 parts powder : 2 parts water for
waterproofing purpose and 5 parts powder : 1 part water as a putty for
repair purpose.
- Always mix
powder to water & stir it well to obtain a lump free mixture. Mix only
quantities to be used within 30 minutes. Mix Dov crystalline mechanically
with clean water to a thick consistency. Separate containers of same
volume should be used to measure powder & water.
Precautions & Limitations
- Application
can be done under normal temperature conditions
- Heavy
traffic should be avoided until the surface is hardened for atleast 5
days.
- Finishes
containing Portland cement may be applied over Dovcrystalline after 3 to 4
hours
- Any paint
or coating should be applied after 28 days only, over Dovcrystalline
application, after thorough wire brushing, washing & removing any
Dovcrystalline residual on surface.
- Dovcrystalline
has a high pH, when mixed with water. Use protective gloves and clothing
& goggles for eye protection.
- Not
recommended over moving joints and structures subjected to movements
- Do not
apply on dry substrate
On Existing or Old Substrates with Dampness
- Ensure
thorough surface preparation by mechanical means, to remove all laitance,
etc., to expose the pores in concrete and allow the penetration of the
treatment.
- All
crevices and holes in concrete shall be filled with Dovcrystalline powder
mixed with water in a ratio of 5 parts powder : 1 part water.
- Over a
concrete substrate in a SSD condition, apply Dovcrystalline mixed in a
ratio 5 parts powder : 2 parts clean water, with a clean brush. Use an
aggressive circular motion of the brush with Dovcrystalline slurry. Apply
a second coat after 3 to 6 hours.
- Dovcrystalline
treated surface shall be left to cure for 2-3 days, as mentioned above and
protect from direct sunlight for this initial period. For full cure, give
28 days along with concrete.
Technical Information
Colour
|
Grey
|
Texture
|
Powder
|
Bulk
Density
|
1.25
|
Penetration
Rate
|
2
mm per week
|
Water
Pressure Head
|
Upto
150 m head
|
pH
when mixed with water
|
11
+ 1
|
Particle
size
|
30-140
microns
|
Coverage
|
6
- 8 sq. ft. in two coats
|
Shelf
Life
|
One
year in original seal pack stored properly
|